NEWS

3 hydropower plants being rebuilt in Azerbaijan

MAY 23, 2024

Azerenerji OJSC, Azerbaijan’s grid operator, will rebuild the Gozlu Bridge, Sheylanli and Ashaghi Malibayli small hydroelectric power plants located in the liberated territories of the country.

In addition, 6 small hydroelectric power plants will be integrated into the grid.

https://report.az/en/energy/3-hydropower-plants-being-rebuilt-in-azerbaijan-s-liberated-territories/